準(zhǔn)確的測量需要選擇正確的儀表、儀表的質(zhì)量是主要的,其次就是要考慮安裝要求,如果安裝不規(guī)范也不能充分發(fā)揮儀表的作用,所以對于流量計(jì)的安裝,我們必須要加以重視,下面技術(shù)人員來為你介紹一下插入式電磁流量計(jì)的安裝要求及注意事項(xiàng):  1、插入式電磁流量計(jì)應(yīng)盡量遠(yuǎn)離具有強(qiáng)電磁場的設(shè)備;    

2、安裝場所不應(yīng)有強(qiáng)烈震動,管道固定牢靠、環(huán)境溫度變化不大;    

3、安裝位置必須保證管道內(nèi)始終充滿被測流體,傳感器安裝管道上游側(cè)直管段長度大于8D,下游側(cè)直管段長度不小于5D;    

4、清理被測管安裝底座的焊渣和毛刺;    

5、將DN80球閥安裝到安裝底座上,注意球閥的長空腔向上,檢查球閥開關(guān)正常;將壓緊螺紋座套件安裝到球閥上,松開定位螺桿與壓緊螺母,將傳感器插入桿通過球閥插入被測管道。傳感器插入深度為延出底座外3mm,符合要求后,上緊定位螺桿與壓緊螺母。同時(shí)注意傳感器方向標(biāo)志與流體流向一致。      

6、被測管道上的開孔大于底座管,底座管插入被測管道的開孔處深度為兩邊焊口平;      

7、插入式電磁流量計(jì)采用不銹鋼焊條平焊,焊后保證法蘭面與管軸線平行;      

8、按插入式電磁流量計(jì)的說明書要求與轉(zhuǎn)換器標(biāo)計(jì)接好電源及其它連線,上電后檢查儀表顯示,確認(rèn)被測管中充滿流體且流量為零時(shí)、查看儀表顯示應(yīng)為零;      

9、被測管中流體流動且穩(wěn)定后,查看儀表顯示,這時(shí)轉(zhuǎn)動傳感器方向使顯示值大,鎖緊定位螺桿與壓緊螺母;      

10、對于流量變化范圍大、流體速度長期低于流量計(jì)要求的低流速的場合,應(yīng)考慮縮小工藝管道或采用兩臺一大一小并聯(lián)安裝的流量計(jì);      

11、插入式電磁流量計(jì)與普通電磁流量計(jì)一樣宜在垂直的工藝管道上安裝,這樣可防止懸浮的固體沉落在電極上,同時(shí)使流體中的油分上升到電極的測量范圍之外,如果流量計(jì)在水平工藝管道上安裝,則應(yīng)使傳感器的電極處于水平軸線上,避免電極由于氣泡產(chǎn)生的干擾,導(dǎo)致測量誤差;      

12、垂直安裝,傳感器插入管道時(shí)應(yīng)與管道斷面的垂直直徑夾角小于5°,適用于測量管道振動小的清潔介質(zhì);      

13、傾斜安裝,其傳感器的軸線與被測管道的軸線夾角為45°,適用于大管徑且測量介質(zhì)中含有其它雜質(zhì)的液體流量測量,該安裝方式水阻小,不宜纏掛。

How to correctly select and install plug-in electromagnetic flow meters?

Accurate measurement requires the selection of the correct instrument, and the quality of the instrument is the main factor. Secondly, installation requirements should be considered. If the installation is not standardized, the instrument cannot fully play its role. Therefore, we must pay attention to the installation of the flow meter. Below, technicians will introduce the installation requirements and precautions of the plug-in electromagnetic flow meter: 1. The plug-in electromagnetic flow meter should be kept as far away as possible from equipment with strong electromagnetic fields;

2. The installation site should not have strong vibrations, the pipelines should be securely fixed, and the environmental temperature should not change significantly;

3. The installation position must ensure that the pipeline is always filled with the measured fluid. The length of the straight pipe section on the upstream side of the sensor installation pipeline is greater than 8D, and the length of the straight pipe section on the downstream side is not less than 5D;

4. Clean the welding slag and burrs on the installation base of the tested tube;

5. Install the DN80 ball valve onto the mounting base, paying attention to the long cavity of the ball valve facing upwards, and check that the ball valve switch is normal; Install the compression threaded seat kit onto the ball valve, loosen the positioning screw and compression nut, and insert the sensor into the tested pipeline through the ball valve. The insertion depth of the sensor is 3mm beyond the base. After meeting the requirements, tighten the positioning screw and compression nut. At the same time, pay attention to the direction markings of the sensor being consistent with the flow direction of the fluid.

6. The opening on the tested pipeline is larger than the base pipe, and the depth at which the base pipe is inserted into the opening of the tested pipeline is equal to the welding joint on both sides;

7. The plug-in electromagnetic flowmeter adopts stainless steel welding rod flat welding, ensuring that the flange surface is parallel to the pipe axis after welding;

8. According to the instructions of the plug-in electromagnetic flowmeter, connect the power supply and other connections to the converter gauge. After power on, check the instrument display and confirm that the measured tube is filled with fluid and the flow rate is zero. Check that the instrument display should be zero;

9. After the fluid in the tested tube flows and stabilizes, check the instrument display. At this time, rotate the sensor direction to increase the displayed value, and tighten the positioning screw and compression nut;

10. For situations where the flow rate varies greatly and the fluid velocity is consistently lower than the low flow rate required by the flow meter, it is necessary to consider reducing the process pipeline or using two flow meters installed in parallel, one large and one small;

11. Insertion electromagnetic flow meters, like ordinary electromagnetic flow meters, should be installed on vertical process pipelines to prevent suspended solids from settling on the electrodes and to raise the oil content in the fluid beyond the measurement range of the electrodes. If the flow meter is installed on a horizontal process pipeline, the sensor electrodes should be placed on the horizontal axis to avoid measurement errors caused by interference from bubbles on the electrodes;

12. Vertical installation, when the sensor is inserted into the pipeline, the angle between the sensor and the vertical diameter of the pipeline section should be less than 5 °, suitable for measuring clean media with low pipeline vibration;

13. Oblique installation, the angle between the axis of the sensor and the axis of the measured pipeline is 45 °, suitable for measuring the flow rate of liquids with large diameters and other impurities in the measuring medium. This installation method has low water resistance and is not suitable for entanglement.


一级黄色动作片久久| 一级坐爱片一级坐爱片| 亚洲自偷自拍另类小说| 伊人麻豆免费视频| 精品九九九九| 亚洲无线观看码| 欧美黄色第一网站| 九九热第一页| 草人影院| 五月丁香成人激情四射| 国产一区免费视频| 国产一区成人电影免费| 搡女人真爽免费视频大全| 亚洲图片欧美在线| 99在线精品视频| 国产一区二区三区小说| 九九香蕉视频| 国产伦精品| 日韩中文首页| 成人 日韩欧美| 久久久美| 亚洲国产日本韩国欧美mv| 91成人精品爽啪在线观看| 999啪| 亚洲国产综合精品中文第一| 国产成人乱| XX综合王| 精品无码中出一区二区| 亚洲xxxxx电影院| 九九99久久精品国产| 中文字幕有码最近人妻| 亚洲国产欧美在线人成大黄瓜| 国产av国片精品有毛| 欧美操婷婷| 粉嫩国产| 精品人妻一区二区三区 | 91av免费在线| 最新在线网址你懂得| 亚洲激情专区| 成品人视频观看| 超碰导航|